Romco Demolition · St. Lucie County
St. Lucie County demolition, quoted after the paperwork is mapped
Port St. Lucie wants utility letters, Fort Pierce wants a debris affidavit, and the state wants an asbestos notice for every demolition, asbestos or not. Romco Builders works out which of those your property needs, then quotes the job. Any type, any size.
- A licensed Florida general contractor
- We quote demolition of every kind and size
- Romco applies for the permit as contractor of record
- Asbestos survey and abatement by licensed firms we coordinate

What decides the job
The teardown is rarely what holds things up
Across St. Lucie, delays tend to come from three places: the wrong permit office, a missing utility letter, and a state notice period that cannot be shortened.
Three cities and a county
Port St. Lucie, Fort Pierce and St. Lucie Village each issue their own permits. Everything outside them, from Lakewood Park to the south end of Hutchinson Island, goes to the county.
A state notice on every demolition
The Florida Department of Environmental Protection wants its demolition notice filed ten working days out on every job, clean building or not. Booking the licensed survey early keeps that notice accurate.
Septic tanks and service lines
Thousands of Port St. Lucie homes still run on septic. Abandonment follows the state onsite sewage rule, and the utility letters have to be in hand before the city releases the permit.
Ground below the water line
Lots along the North Fork and the Indian River Lagoon sit close to the water. When removing a pool shell or footings opens a hole below groundwater, Romco does its own dewatering and Support of Excavation.
Jobs we quote
Demolition we quote, including
One room in a Hutchinson Island condo, a tornado-damaged mobile home, a 1960s block house in Port St. Lucie. If yours is not here, call and describe it.
- Interior demolitionStrip a suite or a house to the studs while the shell and its live systems stay intact.Interior demolition in St. Lucie →
- Selective demolitionTake out an addition, a wing or a bay and keep the building that remains in service.Selective demolition in St. Lucie →
- Commercial demolitionRetail, office and industrial buildings taken down, with approvals run in the right order.Commercial demolition in St. Lucie →
- House demolitionA full teardown of a single-family house, from utility letters to a graded lot.House demolition in St. Lucie →
- Structural demolitionFrames, walls and floors taken down in order, including buildings under unsafe orders.Structural demolition in St. Lucie →
- Concrete removalSlabs, driveways, footings and foundations broken out, hauled and recycled.Concrete removal in St. Lucie →
- Pool removalBreak out the top and backfill, or lift the whole shell, with the drainage handled.Pool removal in St. Lucie →
- Mobile home demolitionSingle and double wides removed with chassis, tie-downs, add-ons and debris cleared.Mobile home demolition in St. Lucie →
- Storm damage demolitionHurricane, tornado and flood damage taken down with the record your insurer needs.Storm damage demolition in St. Lucie →
- Site clearingLots cleared of old structures, slabs and debris, with protected trees left in place.Site clearing in St. Lucie →
- Asbestos coordinationLicensed survey, FDEP notice and licensed abatement scheduled before demolition.Asbestos coordination in St. Lucie →
- Accessory structure demolitionSheds, detached garages, carports and screen enclosures removed under permit.Accessory structure demolition in St. Lucie →
- Something else?Not on the list? We still quote it. Call and talk us through the job.Call (772) 310-3298 →
Start to finish
How a St. Lucie job moves
Reach out
Phone us or use the form. Include the address, what is coming down, what is staying, and photos or plans if you have them.
We look at the property
We check the structure, where power, water and sewer or septic connect, how equipment and trucks reach the work, and what is next door.
A written scope and quote
It lists what is removed, what is protected and what is hauled, and flags anything that depends on the asbestos survey.
Survey, notice, letters, permit
A licensed asbestos survey, the state demolition notice, the utility letters, then the permit from the city, town or county.
Demolition and hauling
Work follows the agreed order. Debris goes to permitted facilities, and the tickets are kept.
Final inspection
The inspector closes the permit. You get a cleared lot, or the shell you asked us to leave.
Around the county
Who signs off depends on where you are
A historic district in Fort Pierce, a platted lot in Port St. Lucie and an oceanfront parcel on the island each answer to different rules. Choose the place closest to yours.
- Demolition in Port St. Lucie
- Demolition in Tradition
- Demolition in St. Lucie West
- Demolition in Sandpiper Bay
- Demolition in Fort Pierce
- Demolition in Lincoln Park
- Demolition in St. Lucie Village
- Demolition in River Park
- Demolition in Lakewood Park
- Demolition in White City
- Demolition in Hutchinson Island South
- Demolition in Unincorporated St. Lucie County
Questions
What owners usually ask
What will my demolition cost in St. Lucie?
We put a number on it once we have seen the job, on site or through photos and plans that show enough. It turns on what the structure is built from, its footprint and height, what the asbestos survey finds, which services need disconnecting, whether a septic tank must be abandoned, how equipment gets in, what sits next door, what you want kept, and the haul to the disposal site. Two houses on the same Port St. Lucie street can quote quite differently, so we do not post rates.
Is any job too small or too large in size for you?
No. We quote a single shed, a screen enclosure, a pool, a mobile home or a full commercial building, and partial jobs where most of the structure stays. Tell us what is on the property and what must remain, and the quote follows that.
Who issues a demolition permit in St. Lucie?
That depends on the parcel. Port St. Lucie, Fort Pierce and St. Lucie Village each run their own permitting, and the county's Building and Code Regulations Division handles all unincorporated land. The county's building guidance applies permits to the removal and demolition of every building or structure. When you hire Romco, we file as contractor of record and schedule inspections through the final. Check the current requirements with the office for your parcel.
Do I need an asbestos survey if I think there is no asbestos?
The state's position is that every demolition needs a written notice, even when no asbestos is found, and the notice has to be filed at least ten working days before demolition begins. St. Lucie notices go to the Florida Department of Environmental Protection's Southeast District. A building permit does not take its place. Fort Pierce also asks for an asbestos report on older homes and commercial buildings. Romco books a licensed survey and brings in a licensed abatement firm for any material found, since we hold no abatement license ourselves.
How long does the whole process take?
We do not estimate it before the facts are in. It depends on review time at your city, town or the county, how quickly the utility letters arrive, the survey result and the state notice period, any historic board review in Fort Pierce, septic abandonment, and the size and construction of the structure. When those answers are in, you get a step-by-step sequence with the holdups for each step spelled out.
Is Romco Builders licensed?
Yes. Romco Builders is a licensed Florida general contractor with its office in Fort Lauderdale. Work that requires its own license, including asbestos abatement, electrical and plumbing disconnects, septic abandonment, mold remediation and tree removal, goes to firms holding that license, and we keep them on one schedule.
What utility paperwork does a demolition need here?
It varies by office. Port St. Lucie's checklist asks for a letter from FPL and one from the city's Utilities Department confirming service has been removed. Fort Pierce wants pre-approval from the Fort Pierce Utilities Authority or FPL before a full demolition. Septic tanks are abandoned under the state onsite sewage rule, Rule 62-6.011. Romco chases each letter and files only when nothing is missing.
Where does demolition debris end up?
At permitted disposal and recycling sites. In St. Lucie County that includes the county's Baling and Recycling Facility on Glades Cut-Off Road, which takes construction and demolition debris. Fort Pierce asks for a debris affidavit with the permit. Asbestos waste, if any, leaves separately with the abatement firm. Hauling and disposal show as their own line on the quote.
Do you cover all of St. Lucie County?
Yes: Port St. Lucie, Fort Pierce, St. Lucie Village and every unincorporated area, including Lakewood Park, River Park, White City and the St. Lucie end of Hutchinson Island. We are based in Fort Lauderdale and work to the rules of whichever office has jurisdiction.
Can one part of a building come down while the rest stays occupied?
Usually, if the sequence is planned first. That means shoring designed by an engineer where structure is removed, barriers that keep dust and debris away from occupied rooms, and work hours agreed with the owner or the condominium association. In an older building, the asbestos survey result often decides the order of the work.
Request a quote
Give us the address and the scope
Photos or plans help. So does a quick phone call. (772) 310-3298.
Every type and size, all over St. Lucie County
Tell us what has to come down, and we will quote it.
Romco Builders is a licensed Florida general contractor, headquartered in Fort Lauderdale. One wall inside a house or an entire building gets the same thing from us: a written scope and a number.
